View Requests - 315 found

Sidewalk Repair at 66 Griggs Rd

Sidewalk is uneven so water pools and causes thick ice, we shovel, salt, and try to move water before it freezes but the slant makes it impossible. An older neighbor tripped on it in Nov and fell.
ASSIGNED A work order has been assigned for this request. A team from the HIGHWAY division will be responding. - 23 days ago #SR-109696
Sidewalk Repair at 66 Griggs Rd

Sidewalk Repair at 2–56 Charles St

Sidewalk in front of Temple Sinai sanctuary steps in need of repair AGAIN. Many elderly people. Whole sidewalk needs replacing as soon as possible. TY
ASSIGNED A work order has been assigned for this request. A team from the HIGHWAY division will be responding. - 24 days ago #SR-110931
Sidewalk Repair at 2–56 Charles St

Sidewalk Repair at 39 School St

Asphalt caving in making sidewalk too narrow
ASSIGNED A work order has been assigned for this request. A team from the HIGHWAY division will be responding. - 24 days ago #SR-110950
Sidewalk Repair at 39 School St

Sidewalk Repair at 244 Summit Ave

Very low quality sidewalks all new all corners of summit x Lancaster and summit X Jenness. They were all poured less than a year ago and have all deteriorated to sand and disintegration. 1 of 4 pix.
ON HOLD The Work Order for this Service Request has been put on hold: This work was completed by a contractor under the supervision of the Engineering and Transportation Division. This has already been referred to Engineering. For any further questions, feel free to contact them at 617-730-2139. - 24 days ago #SR-110947
Sidewalk Repair at 244 Summit Ave

Sidewalk Repair at 265 Summit Ave

2 of 4 pix. Very low quality sidewalks all new all corners of summit x Lancaster and summit X Jenness. They were all poured less than a year ago and have all deteriorated to sand and disintegration.
ON HOLD The Work Order for this Service Request has been put on hold: This work was completed by a contractor under the supervision of the Engineering and Transportation Division. This has already been referred to Engineering. For any further questions, feel free to contact them at 617-730-2139. - 24 days ago #SR-110946
Sidewalk Repair at 265 Summit Ave

Sidewalk Repair at 148 Jordan Rd

3 of 4 pix. Very low quality sidewalks all new all corners of summit x Lancaster and summit X Jenness. They were all poured less than a year ago and have all deteriorated to sand and disintegration.
ON HOLD The Work Order for this Service Request has been put on hold: This work was completed by a contractor under the supervision of the Engineering and Transportation Division. This has already been referred to Engineering. For any further questions, feel free to contact them at 617-730-2139. - 24 days ago #SR-110945
Sidewalk Repair at 148 Jordan Rd

Sidewalk Repair at 255 Summit Ave

4 of 4 pix. Very low quality sidewalks all new all corners of summit x Lancaster and summit X Jenness. They were all poured less than a year ago and have all deteriorated to sand and disintegration.
ON HOLD The Work Order for this Service Request has been put on hold: This work was completed by a contractor under the supervision of the Engineering and Transportation Division. This has already been referred to Engineering. For any further questions, feel free to contact them at 617-730-2139. - 24 days ago #SR-110944
Sidewalk Repair at 255 Summit Ave

Sidewalk Repair at 244 Summit Ave, Brookline 02446

Inferior cement was used when improving the corner of Summit and Lancaster Terrace that is now crumbling in the freeze-thaw cycles and needs to be replaced.
ON HOLD The Work Order for this Service Request has been put on hold: This work was completed by a contractor under the supervision of the Engineering and Transportation Division. This has already been referred to Engineering. For any further questions, feel free to contact them at 617-730-2139. - 26 days ago #SR-110902
Sidewalk Repair at 244 Summit Ave, Brookline 02446

Sidewalk Repair at 17 Blake Rd

Inferior cement used on sidewalk crumbling and cracking please have contractor replace at their expense
ON HOLD The Work Order for this Service Request has been put on hold: This work was completed by a contractor under the supervision of the Engineering and Transportation Division. This has already been referred to Engineering. For any further questions, feel free to contact them at 617-730-2139. - about 1 month ago #SR-110679

Sidewalk Repair at 122 Sumner Rd

Inferior cement used on sidewalk crumbling and cracking please have contractor replace at their expense
ON HOLD The Work Order for this Service Request has been put on hold: This work was completed by a contractor under the supervision of the Engineering and Transportation Division. This has already been referred to Engineering. For any further questions, feel free to contact them at 617-730-2139. - about 1 month ago #SR-110680
Web_branding_watermark

Help make Brookline more beautiful

BrookONline enables real-time collaboration with citizens, 'deputizing' mobile users to become the city's eyes and ears. Citizens report potholes, graffiti, and other issues from anywhere in the Town using their mobile phone. For each issue, type in or select a location, take a photo, pick a specific issue from a drop down, type in a brief description, and enter your email address to receive timely updates.

Start Reporting

  • Android_market
  • App_store

Status

Services